Turtledeck 2hr

Sanded and fit mounting brackets for the stringers. Fit and glued forner to floor.

Friday, March 25, 2016

Thursday, March 24, 2016

Turtledeck 1hr

Sanded the former, glued it to the floor. Cut and sanded squares to hold the stringers.

Saturday, March 19, 2016

Floor fittings 2hrs

Ran the rest of the fittings on the grinder, and test fit in place. Temporarily taped in place.

Thursday, March 17, 2016

Floor fittings 2hrs

Rough cut fittings for floor. Ran a few on the grinder to radius them to the tubing.

Tuesday, March 8, 2016

Instrument panel 1hr

Sanded arch, glued everything together.

Instrument panel 2hrs

Cut and glued plywood to the laminated arch. Sanded the gussets on the  instrument panel and gied it to the floor.

Monday, March 7, 2016

Tuesday, March 1, 2016

End rib 1hrs

Cut, fit and glued vertical members into an existing rib. Ill be making to regular ribs into end ribs.

Sanding horizontal .5hrs

Sanded the plywood doublers flush on the horizontal and vertical.

Sunday, February 28, 2016

Plywood doublers. 5hrs

Marked, cut, sanded, and glued plywood for attah fitting on the vertical.

Plywood doublers 3hrs

Marked, cut and glued plywood doublers for the horizontal stabilizer. These are for the attach points and tail fittings.

End rib 2hrs

Cut gussets,  glued and nailed rib.