Glued up number 3.
Tuesday, December 29, 2015
Saturday, December 26, 2015
Instrument panel lamination .5hrs
Removed from former and sanded. Weighed a hoop at just over 3oz, still more material to remove for final assembly, but seems plenty strong.
Tuesday, December 22, 2015
Instrument panel lamination 1hr
Removed the strips of wood from the former after drying. Glued them up and placed back in the former for curing.
Sunday, December 20, 2015
Friday, December 18, 2015
Instrument panel lamination 1hr
Lightly sanded the 1/8" strips and mixed up some epoxy. Glued all sides and fixed in the jig to cure.
Tuesday, December 15, 2015
Monday, December 14, 2015
Sunday, December 6, 2015
Friday, December 4, 2015
Rocker arms 4hrs
A little more cleaning inside the valve covers. Ran the rocker arms and valve cover clamps in the wire wheel.
Thursday, December 3, 2015
Wednesday, December 2, 2015
Pushrod tubes 5hrs
Cleaned the inside of the pushrod tubes. Cleaned the oring seal seats, and flushed the inside of the tubes. Started wirking on the inside of the valve covers.
Tuesday, December 1, 2015
Pushrod tubes 3hrs
Removing masking tape and cleaning inside of tube. Used small dremel and wire brush to clean oring end.
Monday, November 30, 2015
Friday, November 27, 2015
Thursday, November 26, 2015
Push rod tubes .5hrs
Masked off the oring surface area and the ends. Soaked a second set of tubes before cleaning in a solvent.