Saturday, December 26, 2015

Instrument panel lamination 1.5hrs

Finish sanded the second lamination. Steamed spruce for a third and placed in the former.

Instrument panel lamination .5hrs

Removed from former and sanded. Weighed a hoop at just over 3oz, still more material to remove for final assembly, but seems plenty strong.

Tuesday, December 22, 2015

Instrument panel lamination 1hr

Removed the strips of wood from the former after drying. Glued them up and placed back in the former for curing.

Sunday, December 20, 2015

Instrument panel lamination 2hrs

Removed from the form and rough sanded the lamination. Steamed and put new spruce in the former.

Friday, December 18, 2015

Instrument panel lamination 1hr

Lightly sanded the 1/8"  strips and mixed up some epoxy. Glued all sides and fixed in the jig to cure.

Tuesday, December 15, 2015

Turtledeck 1hr

Soaked 1/8" thick strips of spruce an put put them in the forming jig.

Monday, December 14, 2015

Turtledeck 3hrs

Built forms for bending curved pieces. Designed and measured sizes and location of wood pieces.

Sunday, December 6, 2015

Rocker arms 5hrs

Cleaned and wire wheeled the rocker arms. Inspected and selected the best 12.

Friday, December 4, 2015

Rocker arms 4hrs

A little more cleaning inside the valve covers. Ran the rocker arms and  valve cover clamps in the wire wheel.

Valve covers 2hrs

More cleaning of the inside of the valve covers.

Thursday, December 3, 2015

Valve covers 4hrs

Started cleaning the inside of the valve cover with scotch bright.

Wednesday, December 2, 2015

Pushrod tubes 5hrs

Cleaned the inside of the pushrod tubes. Cleaned the oring seal seats, and flushed the inside of the tubes. Started wirking on the inside of the valve covers.

Tuesday, December 1, 2015

Pushrod tubes 3hrs

Removing masking tape and cleaning inside of tube. Used small dremel and wire brush to clean oring end.